WWTP Headworks Modification & Sludge Dewatering System
Lake Wales, FL
Encore Construction Company Completed October 2003
Project Manager
Headworks modifications included the installation of 2 new slide gates, 1 new JWC Muffin Monster & Screening Auger, aluminum grating.
Sludge Dewatering system consisted of new engineered metal structure over slab on grade, WAS sludge pump & piping, Sludge Flocculator with Polymer feed system, Centrifuge, Screw Press and discharge conveyor.